Trucks with turnable segments ( 2 pcs on each truck ) arriving to port of Ho Chi Min City. A total of 34 segment make up the large turn table, which will be installed and tested by client MT Hojgaard A/S on behalf of NKT Flexibles A/S in Denmark.
 
 A segment is being lifted from quay onboard new build Mv Constance.
 
 Mv Constance overview - partly loaded with units bound for NKT Flexibles A/S and contracted by MT Hojgaard A/S
 
Loading of 14 x cooler units on Seté, France, onboard Mv Ocean Bird bound for Port Louis, Mauritius
 
Loading of 14 x cooler units on Seté, France, onboard Mv Ocean Bird bound for Port Louis, Mauritius
 
Loading of 14 x cooler units on Seté, France, onboard Mv Ocean Bird bound for Port Louis, Mauritius
 
 Large dished heads with total width in excess of 5,7 m. Picture taken east of Moscow.
 
 A total of 3 oversize transports and 16 normal trucks made their way to Uzbekistan -  in convoy.
 
 19 trucks drove a total of aprox. 133.000 km. This is actually the equivalent of having one truck driving arround the globe 3 times!
 
 Catamaran alongside M/V Carten Maria at port of Tallin, Estonia.
 
 Catamaran being loaded at port of Tallin, Estonia.
 
 M/V Carten Maria will carry out transport of Catamaran on deck - from Tallinn, Estonia to Stord in Norway.
 
Loading of 2 x Azimuth Thrusters in Rauma, Finland for Kaliningrad
 
Azimuth Thrusters, arriving at port of Kaliningrad
 
Discharging of cargo in Kaliningrad
 
Loading WILSON ELBE in Kirkenes for Baltic. TPT acting as broker on behalf of charterers
 
Loading WILSON ELBE in Kirkenes for Baltic. TPT acting as broker on behalf of charterers
 
Loading WILSON ELBE in Kirkenes for Baltic. TPT acting as broker on behalf of charterers
 
Loading of 5,19 m wide bucket wheel Unicov, Czech
 
Loading of 5,19 m wide bucket wheel Unicov, Czech
 
Cargo loaded and secured - ready for transport to Hamburg.
 
Fourth segment of ICON TOWER arriving to port of Oslo. This top segment is aprox. 26 meter long and will conclude this Tjuvholmen symbol.
Client CGJensen craning segment at Tjuvholmen.
 
Arrival of first 2 ICON TOWER segments. A total of 4 pieces will make up this Oslo landmark.
Segment 1 and 2 of ICON TOWER being craned from truck and mounted at Tjuvholmen, Oslo.
 
 Client CGJensen mounting final pieces of ICON TOWER at Tjuvholmen.
 
 Discharging of rotor from truck to vessel in Port of Mardas, Turkey.
 
 Loading of rotor with shore cranes onto vessel, bound for Bejaia, Algeria.
 
 FLSmidth rotor waiting to get secured in cargo hold. Next stop Bejaia, Algeria.
 
 Loading of part 1/2 of heat plant for Norway. Cll leaving production hall, to be lifted onto truck.
 
 First cll safely loaded onto truck, and is now waiting for loading of 2nd truck, before beginning first leg of convoy.
 
 2nd cll now loaded and ready to begin route to Akerhus, Norway.
 
September - Loading mill balls in Italy to West Africa
 
September - Loading mill balls in Italy to West Africa
 
September - Loading mill balls in Italy to West Africa
 
Transportation of 3 trafos from Hungary to Estonian power plant
 
Transportation of 3 trafos from Hungary to Estonian power plant
 
 Discharging trafos at the site for Estonian power plant
 
Loading crane from Bergen to Mumbai, August 2011
 
Loading crane from Bergen to Mumbai, August 2011 
 
Loading crane from Bergen to Mumbai, August 2011
 
House Modules from Paldiski to Bergen by Scan-Baltic Service. July 2011.
 
House Modules from Paldiski to Bergen by Scan-Baltic Service. July 2011.
 
House Modules from Paldiski to Bergen by Scan-Baltic Service. July 2011.
 
The 16 m long crane boom arrives at Gdansk port
 
Loading of 16 meter long crane boom unto BBC Adriatic
 
Loading of 16 meter long crane boom unto BBC Adriatic
 
The crane house arrives at Gdansk port
 
Loading of crane house onto deck of BBC Adriatic
 
Loading of crane house onto deck of BBC Adriatic
 
Bridge element from Poland to Denmark - 31 meter length and 60 mt
 
Bridge element from Poland to Denmark - 31 meter length and 60 mt
 
Bridge element from Poland to Denmark - 31 meter length and 60 mt
 
4 tanks waiting to be loaded unboard vessel in Denmark.
 
Loading of 4th tank onto M/V Vega in danish port.
 
Discharging from vessel to truck in Norway.
 
Delivery of equipment for recycling factory from Paldiski port to Tallinn
 
Delivery of equipment for recycling factory from Paldiski port to Tallinn 
 
Delivery of equipment for recycling factory from Paldiski port to Tallinn
 
 
Loading 3,7 m wide belt Conveyors in Estonia for Poland, June 2011.
 
Loading 3,7 m wide belt Conveyors in Estonia for Poland, June 2011.
 

Loading 3,7 m wide belt Conveyors in Estonia for Poland, June 2011.
 
Maj 2011 - Loading boiler in Denmark for Northern Norway
 
Maj 2011 - Loading boiler in Denmark for Northern Norway
 
May 2011 - Discharging boiler in Northern Norway
 
Maj 2011 - 21 meter long steel structure for railway station in Vaanta, Finland.
 
Maj 2011 - 21 meter long steel structure for railway station in Vaanta, Finland.
 
Maj 2011 - 21 meter long steel structure for railway station in Vaanta, Finland.
 
Loading of mill balls in drums onboard M/V Muezzinoglu from Italy to Senegal
 
Loading of mill balls in drums onboard M/V Muezzinoglu from Italy to Senegal
 
Loading of mill balls in drums onboard M/V Muezzinoglu from Italy to Senegal
 
May 2011 - loading inter Blacksea cargo
 
May 2011 - loading inter Blacksea cargo
 
May 2011 - loading inter Blacksea cargo
 
April 2011 - Shipment of House Modules from Estonia –to Norway with Scan-Baltic Service.
 
 
April 2011 - Shipment of House Modules from Estonia –to Norway with Scan-Baltic Service.
 
April 2011 - Loading in Denmark for Krasnodar region
 
April 2011 - Loading in Denmark for Krasnodar region
 
April 2011 - Loading in Denmark for Krasnodar region
 
discharging Temruyk port
 
trucking to site inland Russia
 
trucking to site inland Russia
 
Shipment of 4x Tanks and minor accessories from Romania to Kerch, Ukraine. March 2011.
 
Shipment of 4x Tanks and minor accessories from Romania to Kerch, Ukraine. March 2011.
 
Shipment of 4x Tanks and minor accessories from Romania to Kerch, Ukraine. March 2011.
 
 
Loading of tanks in Randers, DK for transshipment via Temryuk to Vladikavkaz, RU. March 2011.
 
Loading of tanks in Randers, DK for transshipment via Temryuk to Vladikavkaz, RU. March 2011.
 
Shipment of 65mton Catamaran from Tallinn to Oslo, March 2011
 
Shipment of 65mton Catamaran from Tallinn to Oslo, March 2011
 
Shipment of 65mton Catamaran from Tallinn to Oslo, March 2011
 
Loading dairy tanks in Denmark for transshipment in Sandnes to inland destination Naerboe. Feb 2011
 
Loading dairy tanks in Denmark for transshipment in Sandnes to inland destination Naerboe. Feb 2011
 
Loading dairy tanks in Denmark for transshipment in Sandnes to inland destination Naerboe. Feb 2011
Loading 4 x boiler units as breakbulk on container liner vessel in Shanghai to Oslo via transhipment in Rotterdam. Jan 2011
 
Transporting 4 x boiler units as breakbulk on container liner vessel in Shanghai to Oslo via transhipment in Rotterdam. Jan 2011
 
Reloading 4 x boiler units in Rotterdam for Oslo from container liner vessel to coaster. Feb 2011
 
Transporting brewery tank from Denmark for transshipment in Paldiski to Andijan, Uzbekistan Jan 2011
 
Trucking 5,1 m diameter brewery tank from Paldiski to Andijan, Uzbekistan Jan 2011
 
Railing OOG brewery tanks from Paldiski to Andijan, Uzbekistan Feb 2011
 
Reloading beer tanks to railwagons in Paldiski for transit to Andijan, UZ. January 2011
 
Relaoding beer tanks to truck in Paldiski for transit to Andijan, UZ. January 2011
 
Trucking beer tanks from Paldiski to Andijan, UZ. January 2011
 
Loading of Storage Tanks in Sillamäe, Estonia for Norway, January 2011
 
Loading of Storage Tanks in Sillamäe, Estonia for Norway, January 2011
 
Loading of Storage Tanks in Sillamäe, Estonia for Norway, January 2011